MODULAR BUILDERS
Fabprefab
Building smart and sustainable architecturally designed homes.
Website fabprefab.com.au
Manufacturing Location
Hybrid – Offshore (Indonesia) and Onshore (Australia)
Head Office Address
28/222 Wisemans Ferry Road, Somersby, NSW 2250, Australia
Years in Operation
9 years (founded 2016)
Target Markets
Private Homes
Weekenders / Holiday Homes
Guest Houses
Studios / Home Offices
Rural / Regional / Remote
Off-Grid Living
Metropolitan Infill
Licenses and Registrations
NSW Licensed Builder
Business enquiry contact
0401 198 886
ed@fabprefab.com.au
Fabprefab was founded in 2016 by Tony Olding, with over 35 years of experience in residential, retirement living, and commercial building sectors. The company is now led by Managing Director Ed Callanan, a licensed builder and carpenter with 15 years' experience. Fabprefab manufactures unique, factory-built dwellings designed in collaboration with leading architects TRIAS and CHROFI. Built at their custom production facility in Somersby on the NSW Central Coast using cross-laminated timber (CLT) from sustainably managed Australian forests, the homes achieve approximately 10-week build times with installation possible in as little as one day. With capacity to build up to 50 houses per year, Fabprefab offers a total prefab building solution from permit coordination through design, manufacture, and on-site installation. The Minima range received a Commendation in the sustainability category of the HOUSES awards.
Capabilities
Architecturally designed prefab homes
Cross-laminated timber (CLT) construction
Off-grid packages (solar, battery, water harvesting, bio-septic)
Permit phase coordination
Design phase management
Manufacturing and build process
Site preparation and installation
Factory viewing (prototype display)
While prefabAUS endeavours to verify member information, readers are advised to conduct their own due diligence before engaging any listed company.
-
28/222 Wisemans Ferry Road, Somersby, NSW 2250, Australia (solar-powered facility)
-
Up to 50 houses per year; approximately 10 weeks build time.
-
Volumetric modular (CLT panels for walls, floor, and roof); single-day installation for single units.
-
Cross-laminated timber (CLT) from X-Lam Wodonga; sustainably sourced Australian plantation pine.
Certifications
xx